instagram linkedin
Related People
Project

Project Contact

Chris Millman

Alex Gorecki

Fathmath Evan

Ian Smith

Jovan Van Kampen

Nugroho Utomo

Paul Millwood

Robert Collie

Alexander Garrett

Alexandra Arnold

Audun Alfheim

Cassandra Bryant

Don Gilson

James Badgery

Katrina Newland

Sam Boyd

Stuart Mitchell

Willinga Park

Bawley Point

Willinga Park and its three structures – an Equestrian Centre, Covered Arena and Polocrosse Pavilion – are all connected by a set of principles that prioritise site, scale, program and materiality.

The brief? Nothing “horsey.”

The large Equestrian Centre and Covered Arena seamlessly integrate into established topography without comprising functionality for users, visitors and (importantly) horses. Light and ventilation were driving factors in their designs, contributing to the buildings’ distinct sculptural forms. More modestly, the Polocrosse Pavilion sits atop a purpose-built grass embankment that allows spectators to comfortably view the field.

 

The Equestrian Centre complex consists of thirty stables, two dressage arenas, a covered roundyard and walker, a hydrotherapy pool, equine health facilities and associated staff and riders’ areas. The Covered Arena has a seating capacity of approximately one thousand spectators, VIP and media boxes, and two full sized dressage arenas – one of which is roofed.

At the Equestrian Centre, roofs maximise coastal breezes, ensuring natural ventilation while providing shelter for horses. The Covered Arena’s sawtooth roof is similarly pragmatic in conception. The openings allow natural light to pour in under a ninety-by-forty metre expanse of shelter.

So, who’s responsible for Willinga Park? That would be Terry Snow – Canberra native and executive chairman of Capital Airport Group.

 

 

Terry Snow

My passion in life is in building and developing things. That’s what makes me tick. I get a big kick out of my horses, so I thought, why not build something beautiful for them that everyone can enjoy.

Sally Hieatt designed the interiors, consulting with Terry Snow and working closely with COX. She has worked with Terry for over 20 years, designing the interiors for his own home. Sally didn’t require a detailed brief – she already knew what Terry would like.

The designers produced a very understated palette of materials with an emphasis on quality furnishings. Significant artworks provide features and focus within the interiors – including a commissioned piece by renowned Australian artist, Michael Johnson.

Interiors seamlessly integrate to exteriors thanks to the use of concrete and black-butt ceiling cladding. The ceiling is a signature design element for the project – unique and crafted from only the highest quality local blackbutt. Its size and geometry maps to a single triangular space with each section taking an average of three hours on site to fit. This feature added an undeniable warmth and depth, critical to the overall mood of Willinga Park.

Project Director Chris Millman, ‘Willinga Park is an experiment. It’s difficult to describe or define. It begins with horses and a man with an undying pursuit for excellence. Where it will finish remains anyone’s guess, however what has become abundantly clear: we are creating something special.’

As a collective, the three structures embrace an approach to building large facilities for year-round use and events. Willinga Park rejects the idea of architecture and landscape being separate, instead creating a total environment for people, horses and nature.

Terry Snow

Open your shoulders and do something extraordinary.

Awards

Romaldo Giurgola Award for Public Architecture, AIA ACT, 2017

W Hayward Morris Award for Interior Architecture, AIA ACT,2017

Technical Information

City
Bawley Point
Year
2016
Client
Willinga Park
Status
Complete, 2016
Key Consultants
Norman Disney & Young, Vital Solutions, AWT Consulting Engineers, Robert Bird Group, Sally Hieatt Interiors, Oxigen, Lighting Design Partnership
Builder
Construction Control
Gross Floor Area
8,500m2
Photography
Alina Gozin'a